Jobs Manufacturing Technician near Vancouver (BC)
Green job Help - Green job - Help

Available jobs

We found 8 manufacturing technician jobs near Vancouver (BC) on Job Bank. The job postings found are for all Industrial engineering and manufacturing technologists and technicians (NOC 22302).

Location Available jobs Links
Vancouver (BC) 8 View job postings >
British Columbia 11 View job postings >
Canada 160 View job postings >
Job postings throughout the region
Date posted Job title Employer Location Source
Feb 25, 2025 programmer, computer numerically controlled coordinate measuring machine (CNC/CMM) Aptech Precision Machining Inc Richmond (BC) Job Bank
Mar 6, 2025 manufacturing technician LMI Technologies Vancouver (BC) Monster
Mar 7, 2025 planning technician City of Delta Delta (BC) CivicJobs.ca
Dec 6, 2024 quality assurance technologist Raeyco Lab Equipment Systems Management Ltd. Burnaby (BC) Job Bank
Feb 2, 2025 computer numerical control (CNC) Mastercam programmer Aptech Precision Machining Inc Richmond (BC) Job Bank
Mar 9, 2025 manufacturing technician Verathon Burnaby (BC) Monster
Mar 9, 2025 manufacturing technician Verathon Burnaby (BC) Monster
Feb 18, 2025 production and quality control technologist BWXT Vancouver (BC) Monster

News

Read the latest news stories about job creation and layoffs related to the occupation ofprogrammer, computer numerically controlled coordinate measuring machine (CNC/CMM) (NOC 22302).

The province has approved J.D. Irving’s first phase of its $550M Brighton Mountain wind farm project, which could see 34 turbines built near Juniper in Carleton County. Construction must begin within five years and Irving plans to sell the energy to N.B. Power.

  • Other type of event
  • Utilities
  • Added on 2024-12-28
  • Edmundston–Woodstock Region, NB

St. Mary's First Nation is partnering with Eolectric on a proposed project to build a 50-megawatt wind farm near Florenceville-Bristol. The proposed site is close to J. D. Irving’s own planned project, which would produce seven times as much electricity.

  • Other type of event
  • Utilities
  • Added on 2024-11-11
  • Edmundston–Woodstock Region, NB

J.D. Irving is proposing to build a 58-turbine wind farm near Juniper, N.B. The Brighton Mountain wind farm will require regulatory approval, but hopes to break ground in 2025 and would employ 200 workers during construction and create 20 permanent jobs.

  • Other type of event
  • Utilities
  • Added on 2024-05-03
  • Edmundston–Woodstock Region, NB
Labour Market Information Survey
Date modified: